The stone man is slowly putting stone on the exterior.
The trim on the front of the garage is going up.
The tile man has all of the flooring down and is now working on the showers in the bathrooms.
The cabinets for the kitchen, laundry room, bathroom, and study are all over the house and should be all installed in 3 to 4 days.