The plumber is hooking up the water to the house and the stone man finally finished the front wall
And each side of the garage, too.
The air conditioner has been installed.
The kitchen countertops went in yesterday.
Bathroom cabinets and countertops are in.
Bathroom tile is finished.
Front walkway and driveway are done.
Wall and walkway to the side of the house are done.
The retaining wall is complete
This quadrafoil is going up at the peak of the front of the garage.
. Next week the tile man continues with the kitchen backsplash and the wood floors in the bedrooms.
Light fixtures and ceiling fans go in on Monday. Meeting with the irrigation guy to install the sprinkler system.